Google Photos Link
Gunstock Rally WhatsApp Group

Rally Schedule - Click Here to View the Full Schedule

Yard Sale Items
Blaupunkt Henri e-bike
Condition is like new.
$1,000.
Valerie Davis
BRN #15535

PI Industries Extended Run Auxiliary tank.
Never used. If new, these are $250.
Asking $125.
Valerie Davis
BRN #15535

Rustic Pumpkins
Set of 3 rustic pumpkins handmade by an Airstreamer! Pumpkins are 4.5", 5.5", and 6.5" inches tall. Made from pine and finished in fall orange and off white. Email me prior to event to ensure I bring enough with me.
$25
Bruce Frey
hsgsports@mac.com
Equalizer Sway Control Hitch
Model 90-00-1000 Max Tongue wt 1,000 lb Max Trailer wt 10,000 lb
In use for less than 1,000 miles, upgraded to 3/4 ton TV & chose a different hitch set up.
Everything included from purchase, plus 2’ to 2 1/2’ sleeve adapter & anti rattle hitch hardware.
Equalizer website lists for $775
$500 OBRO
Webb Russell
BRN #31503




Garmen RV GPS 890-MT-S
Comes with power cord and window mount. Bluetooth. Works great and directs you away from low bridges and underweight bridges. If you're a New Englander, you know all about that.
$100
Joel White
BRN $19450


Bond Portable Propane Fire Pit with 20 lb Propane Tank
Perfect for backyard or campsite get together.
See full description link from Lowes.
$100
Bruce Frey
BRN #11719
.
. 
Airstream Stainless Steel Dual Propane Cover
Brand new.
Not sure model number or what Airstream it's for, but I'm working on it.
Ordered wrong one and wasn't able to return it.
$TBD
Susan Chandonnet
BRN #21960





2023 GT 23' Contour Built in Airfry and Convection Microwave
$300
Furrion - Propane RV cooktop with glass cover, 3 burners stainless steel
$200
Joel White
BRN19450

5 Flag Pole Holder
Designed and fabricated by Airstream member John Leake
$40
Clifford H.
BRN 7955

2023 Starlink REV3 Standard Actuated
Works great! Paid $600 in 2023
$100
Clifford H.
BRN 7955


Auction Items
Virginia Highland Haven Getaway - Blue Ridge Mountains, Virginia
Mark and Denise Van der Voort are excited to auction a wonderful Virginia getaway to the Region 1 Rally Auction at Gunstock!
The winning bidder will receive:
Five-night stay at Virginia Highland Haven in Copper Hill, Virginia, nestled in the magnificent Blue Ridge Mountains - $205 value
$50 gift certificate to The Floyd Country Store to enjoy dining while exploring the charming town of Floyd. Two tickets to the famous Friday Night Jamboree at The Floyd Country Store - $24 value
Total Package Value: $279
Mark and Denise Van der Voort
BRN #1396
Quilt
All Cotton
70" x 69"
All work done by Kathi Mitchell BRN #1100

Raffle Items
Quilted wall hanging.
Cotton fabric.
All work done by Kathi Mitchell
“24 X 14 1/2”.
BRN #1100
$50 Value

Clear20
Clear2O DirtGUARD RV Water Filtration Starter Kit (CSK5000) – $199.99
Clear2O DirtGUARD Total Filtration System (CTFS8000) – $110.99
Clear2O TankFRESH Water Tank & System Flush (TFG2064) – $29.99
Clear2O DustGUARD RV Air Filter Cut-To-Fit (DGA2017) – $29.99
Clear2O Dual Personal Water Filter (PWF850) – $28.99
Tag CLEAR2O in your social media posts using #CLEAR2O, #DirtGUARD, #TankFRESH, and #DustGUARD.
